Opening event in the connecting tunnel (gallery) built within the framework of the RRF

Date 12th. December, 2025
Time 11:00 AM
Place Jēkabpils
Opening event in the connecting tunnel (gallery) built within the framework of the RRF

A connecting tunnel (gallery) has been built within the framework of the Recovery and Resilience Fund project of SIA "Jēkabpils Regional Hospital" - an overground passage connecting the inpatient unit with the main inpatient unit.

The event is organized by: Iveta Dobele